Double Oak Community Church

 

Mt. Laurel – Jefferson County, Alabama

 

  • Phase II

  • This project consists of a three story, 10,400 square foot education building adjacent to the main church building.

  • The main church building was under construction and required considerable coordination with the new addition.

  • The construction for the addition is a light gauge trussed roof supported by load bearing masonry walls.

  • The second and third floor construction consists of steel bar joists also supported on load bearing masonry walls.

  • The foundations are conventional shallow foundations.

  • Phase III

  • This two-story, 8400 square foot education building addition is adjacent to the Phase II building.

  • The structural framing system is a light gauge trussed roof supported by load bearing masonry walls.

  • The floor construction consists of steel bar joists also supported on load bearing masonry walls.
  • The foundations are conventional shallow foundations.

  • Phase IV

  • This project consists of the design of 13,040 square foot student center and gymnasium.

  • The student center will consist of a two story facility including classrooms.

  • The construction of the gymnasium consists of long-span steel joists supported by load bearing masonry walls.

  • The construction of the student center consists of prefabricated wood roof trusses and parallel chord wood floor trusses supported by load-bearing wood framed walls.

  • The foundations are conventional shallow foundations.